PSA 9/23/24 Water Division will be installing a two-inch water valve
PSA 9/20/24 LAS VEGAS RECEIVES THE NEW MEXICO LAND AND WATER CONSERVATI ON, STATE OF NEW MEXICO ENERGY AND MINERALS AND NATURAL RESOURCES GRANT
PSA 9/19/24 Contractors will be connecting a water line
PSA 9/10/2024 Solid Waste Department commercial routes will be delayed
PSA 9/10/24 Las Vegas contractor will be connecting three main water lines
PSA 9/4/24 ROAD CLOSURE
PSA 8/30/24 Pool to Re-open September 3rd
PSA 08/29/24 Abe Montoya Closed Labor Day
PSA 8/28/24 Contractor will be connecting a main water line San Miguel Street
PSA 8/28/29 Contractor will be connecting a main water line
PSA 8/27/24 San Miguel Street area may experience low water pressu re or a water outage during this time
PSA 8/27/24 Contractor will begin tying in a water main on Hot Springs Boulevard
PSA 8/22/24 City of Las Vegas contractor will begin asphalt paving on Independence Avenue
PSA 8/22/24 The repair and re-route of the kitchen sewer lines at the Las Vegas Senior Center
PSA 8/21/24 The City of Las Vegas Streets Division will be repairing the east bound lane on Douglas Avenue between 9th Street and 10th Street today, August 21st.
PSA 8/20/2024 City of Las Vegas Lifts All Water Restrictions
PSA 8/16/24 City of Las Vegas potable water standpipe will have to be manually activated by City Staff until further notice.
PSA 8/15/24 From 10:30 am until 3:00 pm, the water division will be installing new valves and a 6-inch water main on Plata Drive.
PSA 8/14/24 Solid Waste Residential routes will be delayed today due to minimal staffing.